Customer guide to order

  • Choose Your Charger
  • Select Installation Option *Free or Paid *(ensure you read and confirm eligibility)
  • Choose a Preferred Date & Time for Your Installation
  • Add to Cart & Check out
  • The UnitedEV team will be in contact to confirm details and gather evidence for the OZEV grant claim (where applicable)
  • We will carry out the grant claim on your behalf and automatically deduct this from the total you pay.

Domestic Install Costings


Standard Installation £0.00

( Inclusive of Electric Vehicle Homecharge Scheme Government Contribution )
  • Up to 15 metres of cabling run externally
  • Connection at your consumer unit or meter position
  • Fitting of Surge protection where required
  • Fitting of current limiting clamp and wiring upto 15 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi network
  • Test and inspection of the installation

We will fully install and commission your single phase charger upto 7.4Kw to include the running of a cable fixed on the outside of your property upto 15 metres at a maximum height of 2.8 metres, the fitting of a separate consumer unit within your property or external meter box (unless existing consumer unit allows for direct connection), the fitting and connection of your charge point to a wall and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins,connection and set up of current transformer clamp to monitor Installation loading, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, steady WiFi signal is required at the charge point location to -68dBm or superior, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management. Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation £350

( Excluding Electric Vehicle Homecharge Scheme Government Contribution )
  • Up to 15 metres of cabling run externally
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of current limiting clamp and wiring upto 15 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi network
  • Test and inspection of the installation

We will fully install and commission your single phase charger upto 7.4Kw to include the running of a cable fixed on the outside of your property upto 15 metres at a maximum height of 2.8 metres, the fitting of a separate consumer unit within your property or external meter box (unless existing consumer unit allows for direct connection), the fitting and connection of your charge point to a wall and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins,connection and set up of current transformer clamp to monitor Installation loading, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, steady WiFi signal is required at the charge point location to -68dBm or superior, please ensure charge point has curtailment option or you have purchased management device where needed 90% of installs will require load management, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management. Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation + 10 Additional Metres of cable £75

( Inclusive of Electric Vehicle Homecharge Scheme Government Contribution )
  • Up to 25 metres of cabling run externally
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of current limiting clamp and wiring upto 25 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi network
  • Test and inspection of the installation

We will fully install and commission your single phase charger upto 7.4Kw to include the running of a cable fixed on the outside of your property upto 25 metres at a maximum height of 2.8 metres, the fitting of a separate consumer unit within your property or external meter box (unless existing consumer unit allows for direct connection), the fitting and connection of your charge point to a wall and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins,connection and set up of current transformer clamp to monitor Installation loading, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, claim of the grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, steady WiFi signal is required at the charge point location to -68dBm or superior, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management. Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation + Additional 10 Metres of cable £425

( Excluding Electric Vehicle Homecharge Scheme Government Contribution )
  • Up to 25 metres of cabling run externally
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of current limiting clamp and wiring upto 25 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi network
  • Test and inspection of the installation

We will fully install and commission your single phase charger upto 7.4Kw to include the running of a cable fixed on the outside of your property upto 25 metres at a maximum height of 2.8 metres,, the fitting of a separate consumer unit within your property or external meter box (unless existing consumer unit allows for direct connection), the fitting and connection of your charge point to a wall and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins,connection and set up of current transformer clamp to monitor Installation loading, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, steady WiFi signal is required at the charge point location to -68dBm or superior, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management. Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation + Integrated control to maximise use of your existing Solar PV System £80

( Inclusive of Electric Vehicle Homecharge Scheme Government Contribution )
  • Up to 15 metres of cabling run externallyConn
  • ection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply to monitor the solar output
  • Fitting of current limiting clamp and wiring upto 15 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi network
  • Test and inspection of the installation

We will fully install and commission your single phase charger upto 7.4Kw to include the running of a cable fixed on the outside of your property upto 15 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your property or external meter box (unless existing consumer unit allows for direct connection), the fitting and connection of your charge point to a wall and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp to monitor the flow of electricity and divert surplus power produced by your existing solar system to the EV charge point upto a maximum distance of 15 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point,steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of solar compatible charge points and a separate management device must be purchased to enable connectivity where required, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation + Integrated control to maximise use of your existing Solar PV System £430

( Excluding Electric Vehicle Homecharge Scheme Government Contribution )
  • Up to 15 metres of cabling run externally
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply to monitor the solar output
  • Fitting of cable holders/cradles if applicable
  • Fitting of current limiting clamp and wiring upto 15 metres between charge point and meter, additional accessories to charge point required in some cases
  • Connection and commissioning via local WiFi network
  • Test and inspection of the installation

We will fully install and commission your single phase charger upto 7.4Kw to include the running of a cable fixed on the outside of your property upto 15 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your property or external meter box (unless existing consumer unit allows for direct connection), the fitting and connection of your charge point to a wall and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp to monitor the flow of electricity and divert surplus power produced by your existing solar system to the EV charge point upto a maximum distance of 15 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, steady WiFi signal is required at the charge point location to at least -68dBm or superior, the EV charge point must be selected from our range of solar compatible charge points and a management device must be purchased to enable connectivity where required, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management. Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


I Can’t Find a suitable option ??

Please contact one of the team who can discuss your requirements and will be happy to advise.


Commercial Install Costings


Standard Installation 1 Charge Point - £650.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 2 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge point to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 2 Charge Points - £1300.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 4 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 3 Charge Points - £1950.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 6 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 4 Charge Points - £2600.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 8 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 5 Charge Points- £3250.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 10 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 6 Charge Points - £3900.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 12 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 7 Charge Points - £4550.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 14 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 8 Charge Points - £5200.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 16 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 9 Charge points - £5850.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 18 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 10 Charge Points- £6500.00

( Inclusive of Workplace Charging Scheme Government Contribution )
  • Up to 50 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 50 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 20 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the WCS grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 1 Charge Point - £1000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 2 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge point to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 2 Charge Points - £2000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 4 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management,any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 3 Charge Points - £3000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 6 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 4 Charge Points - £4000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 8 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 5 Charge Points - £5000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 10 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 6 Charge Points - £6000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 12 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 7 Charge Points - £7000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 14 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 8 Charge Points - £8000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter positionFitting
  • of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 16 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 9 Charge Points - £9000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 30 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 30 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 18 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.


Standard Installation 10 Charge Points - £10000.00

( Excluding Workplace Charging Scheme Government Contribution )
  • Up to 50 metres of cabling run externally on the building
  • Connection at your consumer unit or meter position
  • Fitting of surge protection where required
  • Fitting of monitoring clamp at your incoming supply
  • Fitting of current limiting clamp and wiring upto 50 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi or hard wired data point in your data cabinet or switch
  • Supply of 20 RFID cards
  • Test and inspection of the installation

We will fully install and commission your single or three phase charger upto 22Kw to include the running of a cable fixed on the outside of your workplace building up to 30 metres to a maximum height of 2.8 metres, the fitting of a separate consumer unit within your building or external meter box (unless existing consumer unit/distribution board allows for direct connection), the fitting and connection of your charge points to a wall or post and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins, connection and set up of current transformer clamp to monitor Installation loading, the wiring and fitting of a CT Clamp load management device upto a maximum distance of 30 metres, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, a data connection point must be available within your existing data cabinet or switch alternatively in some circumstances steady WiFi signal is required at the charge point location to -68dBm or superior, the EV charge point must be selected from our range of Workplace Charging Scheme approved units, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management, any civils works including the reinstating digging and laying of underground cables, ducts and Charge Point Ground mounted posts must be arranged and paid for by you or your company, Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.

To Top